Final | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 14:19:12. Contact: ###-####. ok 1/31/2001 12:22:25 PM
|
Electrical Rough-In | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 12:00:44. Contact: ###-####.
|
Electrical Rough-In | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 13:35:42. Contact: ###-####. Walls ok 12/22/2000 8:42:01 AM
|
Electrical Rough-In | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PART |
Pat Lass
|
|
|
conference Bob or Brian ###-####
|
Electrical Rough-In | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:10:44. Contact: ###-####. requires patient care areas to be designated 12/20/2000 9:49:25 AM
|