Electrical Rough-In | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 08:42:14. Contact: ###-####.
|
Final | 12/22/2000 | 12/26/2000 | 12/26/2000 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 09:11:22. Contact: ###-####. id. neutral entire length/manf. specs size of conducters/250 122 equip grd 12/26/2000 10:27:51 AM
|
Permanent Service | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PASS |
Joe Ray
|
|
|
Kent Jones ###-####
|