Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 18:31:40. Contact: ###-####.
|
Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 10:57:31. Contact: ###-####. 250-148 grds in box/bond around waterheater/water clamp 4/2/2001 3:26:13 PM
|
Electrical Rough-In | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | PASS |
Pat Lass
|
|
|
early am if possible alan ###-#### grid ceiling/soffit two different place in this building
|
Rough-In Permanent Service | 3/12/2001 | 3/13/2001 | 3/13/2001 | P | PART |
Pat Lass
|
|
|
allan ###-#### r/i ser P/S U/G N Ok 3/12/2001 4:27:45 PM
|
Electrical Rough-In | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 09:18:00. Contact: ###-####. conduit under slab U/G Ok 2/1/2001 3:02:27 PM
|
Electrical Rough-In | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | PASS |
Joe Ray
|
|
|
ALLEN-- ###-#### UFFER GROUND
|
Permanent Service | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 07:45:58. Contact: ###-####. NEEDED A R/I INSP
|