Final | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 09:47:45. Contact: ###-####.
|
Electrical Rough-In | 12/29/2000 | 1/2/2001 | 1/2/2001 | A | FAIL |
Joe Ray
|
|
|
bond metal back equip./grds to neutral main panel/bond gas/bond water/ grd electode #4 1/2/2001 10:03:46 AM
|