Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 08:35:26. Contact: ###-####.
|
Electrical Rough-In | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 09:48:48. Contact: ###-####.
|
Electrical Rough-In | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 10:05:50. Contact: ###-####. no access left note called contr. 2/9/2001 3:53:25 PM
|
Temporary Service | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 10:36:22. Contact: ###-####.
|