Final | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 15:55:58. Contact: ###-####.
|
Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 15:50:45. Contact: ###-####.Support box 1/5/2001 11:37:51 AM
|
Final | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 11:24:20. Contact: ###-####. needs to support mc cable 1/3/2001 5:35:40 PM
|