Final | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 07:23:06. Contact: ###-####. completed. ok. 2/22/2001 1:50:47 PM
|
Electrical Rough-In | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 12:06:58. Contact: ###-####. R/I walls ok 2/7/2001 10:15:37 AM
|
Electrical Rough-In | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 07:46:35. Contact: ###-####. 7th floor ceiling ele r/i, phase #1. 1/19/2001 11:22:40 AM
|
Electrical Rough-In | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 17:28:25. Contact: ###-####. phase #1; walls ele r/i. ok. 1/4/2001 11:29:53 AM
|