Final | 9/5/2001 | 9/6/2001 | 9/6/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 08:42:57. Contact: ###-####. ok 9/6/2001 3:23:53 PM
|
Final | 7/25/2001 | 7/30/2001 | 7/30/2001 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 13:59:25. Contact: ###-####. meet with Tri State conference ok 7/30/2001 3:32:05 PM
|
Electrical Rough-In | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by Inspector: 315 On 7/18/2001 4:50:42 PM conference wiyh 315 7/19/2001 1:05:31 PM
|
Final | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### 7/18/2001 4:46:18 PM need to meet contractor at job site waiting for call 7/18/2001 4:48:21 PM
|
ELE-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 | | FAIL |
Jack Frank
|
|
|
still waiting to hear from contractor 7/16/2001 1:19:40 PM
|
ELE-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | PART |
Jack Frank
|
|
|
S U C
5/21/2001 8:37:38 AM
|
Electrical Rough-In | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 15:05:37. Contact: ###-####. cover for electrode ok 1/12/2001 12:59:37 PM
|
Final | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 09:44:49. Contact: ###-####. need to meet with contractor 1/10/2001 5:02:21 PM
|