Final | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PASS |
Marv Burrus
|
|
|
###-####. completed. 2/12/2001 4:07:43 PM
|
Final | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 10:25:33. Contact: ###-####. 2/6/2001 3:42:21 PM. temporary occupancy.
|
Final | 2/2/2001 | 2/5/2001 | 2/5/2001 | A | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 09:16:54. Contact: .
|
Electrical Rough-In | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PASS |
Marv Burrus
|
|
|
Skip ###-####. front area walls ele r/i. 1/31/2001 10:07:34 AM
|