Final | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 09:33:46. Contact: ###-####. completed. 1/25/2001 2:34:01 PM
|
Electrical Rough-In | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PASS |
Marv Burrus
|
|
|
Lenny ###-####. 2-bedrooms and 1-bathroom ele r/i upgrade. ok. 1/18/2001 11:09:11 AM
|
Electrical Rough-In | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | FAIL |
Marv Burrus
|
|
|
r/i lenny-- home 381-052. possibly incorrect address? resident didn't have electrical work installed. called contractor twice-no answer, left message, no reply. 1/17/2001 3:19:16 PM
|