Final | 5/22/2001 | 5/25/2001 | 5/25/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 13:34:07. Contact: ###-####. ok 5/25/2001 3:05:37 PM
|
Final | 5/8/2001 | 5/8/2001 | 5/8/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### cor. and $$2.00 reinspection fee due called left message see JF for details 5/9/2001 1:37:49 PM
|
Electrical Rough-In | 5/1/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Jack Frank
|
|
|
###-####
|
Electrical Rough-In | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jack Frank
|
|
|
###-#### conference only 3/9/2001 9:12:50 AM
|
Electrical Rough-In | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Jack Frank
|
|
|
conference only greg ###-#### ok 1/17/2001 5:30:14 PM
|