Final | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 09:24:21. Contact: ###-####.
|
Permanent Service | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 15:03:14. Contact: ###-####. electrode ok for cover of concrete 1/26/2001 10:14:12 AM
|
Permanent Service | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 10:37:46. Contact: ###-####.P/S U/G N Ok 1/26/2001 3:34:42 PM
|
Electrical Rough-In | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/23/2001 2:43:59 PM meet with Wayne of Kendal Electric for a conference ok
|