Final | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Marv Burrus
|
|
|
fn -phil-- ###-####. corrections completed. 8/7/2001 1:48:19 PM
|
Final | 8/2/2001 | 8/6/2001 | 8/6/2001 | P | FAIL |
Joe Ray
|
|
|
fn ###-#### phil recpt kitchen counter end/closet lght shelf space 8/6/2001 3:43:08 PM
|
Final | 7/31/2001 | 8/1/2001 | 8/1/2001 | P | FAIL |
Joe Ray
|
|
|
bill ###-#### no panel cover/not labeled /lock out for dish washer/single outlet for ded. circut/ bathroom recpts not working/m.w. box flush with combustable mat./closet lights to close to shelf 8/1/2001 2:44:50 PM 8/1/2001 2:51:02 PM
|
ELE-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | PASS |
Marv Burrus
|
|
|
This is an aging activity. still in progress. 5/16/2001 8:10:28 PM
|
Rough-In Permanent Service | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 12:47:38. Contact: ###-####. single family residense.
p/s ug n phil baker #0247
quail ridge sub no. 07 Lot: 21 Block: 5 2/8/2001 9:24:55 AM
|
Electrical Rough-In | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### ok cover ri 1/31/2001 10:49:46 AM
|
Electrical Rough-In | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | NR |
Mike Kinnear
|
|
|
###-#### n/r conf with contractor 1/29/2001 3:01:45 PM
|
Electrical Rough-In | 1/25/2001 | 1/26/2001 | 1/26/2001 | P | NR |
Mike Kinnear
|
|
|
conferance with concractor phil ###-#### r/i 1/29/2001 10:33:32 AM
|
Electrical Rough-In | 1/24/2001 | 1/25/2001 | 1/25/2001 | P | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 13:57:32. Contact: ###-####.cancel per phil
|