Final | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:14:48. Contact: ###-####. ok 5/2/2001 1:16:30 PM
|
Final | 4/30/2001 | 5/1/2001 | 5/1/2001 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 15:36:24. Contact: ###-####.
|
Final | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | FAIL |
Jack Frank
|
|
|
greg ###-#### fn - conference only ok 4/30/2001 11:05:06 AM
|
Final | 4/24/2001 | 4/26/2001 | 4/26/2001 | A | FAIL |
Jack Frank
|
|
|
Call john ###-#### cor.posted called no answer electrical work covered before inspection 4/26/2001 9:55:17 AM
|