Final | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 08:59:39. Contact: ###-####. some fixtures not installed; basement. 2/15/2001 9:07:53 AM
|
Final | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 10:56:37. Contact: ###-####. completed. ok 2/15/2001 2:04:52 PM
|
Electrical Rough-In | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 15:25:13. Contact: ###-####. basement ele r/i. 1/31/2001 9:20:15 AM
|