Final | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 14:54:30. Contact: ###-####. not ready 2/16/2001 10:39:31 AM
|
Final | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/16/2001 at 10:33:55. Contact: ###-####. ok final 2/16/2001 3:18:46 PM
|
Final | 2/14/2001 | 2/15/2001 | 2/15/2001 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 16:09:00. Contact: ###-####. not ready they call 2/15/2001 2:35:03 PM 2/15/2001 2:35:29 PM
|
Electrical Rough-In | 2/9/2001 | 2/12/2001 | 2/12/2001 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 16:29:14. Contact: ###-####.--------NEED TO LOOK AT ABOVE CEILING WIRING FOR THE BANK ok cover ceiling 2/12/2001 2:41:41 PM
|
Electrical Rough-In | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 2/12/2001 4:59:56 PM
|
Electrical Rough-In | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PART |
Marv Burrus
|
|
|
Barbara ###-####. bank area walls, canopy ele r/i. 1/31/2001 11:04:15 AM
|
Electrical Rough-In | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 09:01:47. Contact: ###-####. conf with contractor 1/31/2001 10:49:26 AM
|