Final | 3/13/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 18:48:11. Contact: ###-####.
|
Electrical Rough-In | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 10:19:40. Contact: ###-####.
|
Rough-In Permanent Service | 1/31/2001 | 2/2/2001 | 2/2/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 13:33:31. Contact: ###-####. p/s ug n ok 2/2/2001 2:00:01 PM
|