Final | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 11:29:25. Contact: ###-####.
|
Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 15:14:38. Contact: ###-####. not ready 4/18/2001 9:18:34 AM
|
Rough-In Permanent Service | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:53:55. Contact: ###-####.P/S U/G N Ok 2/15/2001 11:51:50 AM
|
Rough-In Permanent Service | 2/15/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Pat Lass
|
|
|
Added by Inspector: 336 On 2/15/2001 11:21:59 AM P/S U/G N Ok 2/15/2001 11:22:35 AM
|