Final | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 10:17:16. Contact: ###-####.
|
Final | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 08:30:24. Contact: ###-####. not compete 9/24/2001 3:26:05 PM
|
Electrical Rough-In | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 12:53:24. Contact: ###-####. ice melting system 8/15/2001 9:30:53 AM
|
Final | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Joe Ray
|
|
|
temp fn - john campbell ###-#### temp/occup ok 8/7/2001 2:26:39 PM
|
Electrical Rough-In | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PASS |
Joe Ray
|
|
|
ceiling insp-- john- ###-####
|
Electrical Rough-In | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:22:34. Contact: ###-####. under ground for parking ot lights 6/12/2001 12:22:43 PM
|
Rough-In Permanent Service | 5/16/2001 | 5/17/2001 | 5/17/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 13:08:33. Contact: . p/s ug n ok 5/17/2001 9:56:40 AM
|
Electrical Rough-In | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Joe Ray
|
|
|
r/i tim ###-#### basement ok for cover 5/3/2001 2:31:07 PM
|
Electrical Rough-In | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 07:49:20. Contact: ###-####. 1st floor and attic ok for cover 4/26/2001 2:48:38 PM
|
Electrical Rough-In | 4/16/2001 | 4/17/2001 | 4/17/2001 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 16:10:25. Contact: ###-####. r/i for dry wall of ceilings 4/17/2001 9:14:06 AM
|
Electrical Rough-In | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Joe Ray
|
|
|
###-#### r/i east side walls only 4/16/2001 3:01:55 PM
|
Electrical Rough-In | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 11:24:49. Contact: ###-####. r/i out side soffit 4/9/2001 3:00:04 PM
|
Electrical Rough-In | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 08:29:55. Contact: ###-####. concrete encased electrode ok 2/9/2001 12:19:59 PM
|