Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 16:34:11. Contact: ###-####. ok 4/13/2001 9:38:23 AM
|
Final | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 15:18:45. Contact: ###-####. low and high voltage cables not supported corrections not made 4/11/2001 11:17:45 AM
|
Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 11:11:43. Contact: ###-####. cor. posted called see JF for details 4/5/2001 10:14:57 AM
|
Electrical Rough-In | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Jack Frank
|
|
|
for walls only Jerry ###-#### lab walls ok 2/20/2001 12:51:06 PM
|