Final | 3/2/2001 | 3/5/2001 | 3/5/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 07:56:01. Contact: ###-####. ok 3/5/2001 2:21:48 PM
|
Electrical Rough-In | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 10:43:09. Contact: ###-####. ok cover walls 2/20/2001 9:51:16 AM
|
Electrical Rough-In | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:43:37. Contact: ###-####. u/g ok 2/15/2001 11:52:49 AM
|