Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Jack Frank
|
|
|
###-#### ok 3/8/2001 4:16:33 PM
|
Final | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Joe Ray
|
|
|
###-####- doug fn temp/occup only 3/7/2001 3:43:49 PM
|
Electrical Rough-In | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PASS |
Pat Lass
|
|
|
r/i- doug ###-#### ceiling ok 3/1/2001 12:32:08 PM
|
Electrical Rough-In | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Pat Lass
|
|
|
###-#### Walls ok 2/15/2001 2:46:24 PM
|