Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 18:30:37. Contact: ###-####.
|
Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 10:58:58. Contact: ###-####. /bond around waterheater/unused openings 4/2/2001 3:24:57 PM
|
Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 12:41:33. Contact: ###-####. no lockout on water heater signed T/O 3/16/2001 9:39:51 AM
|
Electrical Rough-In | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 11:31:31. Contact: .
walls ok 2/28/2001 11:44:27 AM
|