Final | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### ok final 6/29/2001 12:13:23 PM
|
Final | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 18:22:53. Contact: ###-####. not completed. contractor to reschedule. 6/20/2001 3:33:07 PM
|
Electrical Rough-In | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PASS |
Jack Frank
|
|
|
ceiling inspection Tim ###-#### ok 5/31/2001 3:27:14 PM
|
Permanent Service | 5/4/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Jack Frank
|
|
|
Tim ###-#### p/s u/g new ok 5/7/2001 4:39:07 PM
|
Permanent Service | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### 250-64 (e) correction called 5/4/2001 9:33:28 AM
|
Electrical Rough-In | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | PART |
Jack Frank
|
|
|
LATE PM TIM ###-#### walls and hard ceilings ok 4/13/2001 3:40:24 PM
|
Electrical Rough-In | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 3/30/2001 12:30:35 PM conference building not protected
|
Electrical Rough-In | 3/15/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 3/15/2001 9:11:40 AM per const meeting 3/15/2001 10:00:58 AM
|
Electrical Rough-In | 3/6/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Jack Frank
|
|
|
FOR GROUNDWORK-- TIM -###-#### service and phone conduits 3/7/2001 12:33:04 PM
|