Final | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 14:30:20. Contact: ###-####. completed, ok. 3/15/2001 10:41:41 AM
|
Permanent Service | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 09:36:52. Contact: ###-####. perm/svc, ok.
p/s oh r multi-state ele #0628
contractor has connected to power. 3/6/2001 2:26:43 PM
|
Electrical Rough-In | 3/1/2001 | 3/2/2001 | 3/2/2001 | P | NR |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 15:05:31. Contact: .
grounding electrodes not completed. called contact phone number, left message, no reply
3/4/2001 7:53:37 PM
|
Electrical Rough-In | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PART |
Marv Burrus
|
|
|
###-####. breezeway ele r/i ok. corrections posted for service. nec: 300-4(d). 3/1/2001 1:02:39 PM
|