Final | 7/13/2001 | 7/16/2001 | 7/16/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 18:10:41. Contact: ###-####.
|
ELE-Aging Inspection | 6/26/2001 | 6/26/2001 | 6/26/2001 | | PASS |
Joe Ray
|
|
|
still under contr 6/27/2001 7:17:04 AM
|
Electrical Rough-In | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 12:15:03. Contact: ###-####. ok 3/27/2001 10:54:49 AM
|
Electrical Rough-In | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 12:11:11. Contact: ###-####. see jack for violatoins 3/19/2001 10:43:49 AM
|
Electrical Rough-In | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 12:11:11. Contact: ###-####.
|
Rough-In Permanent Service | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | PART |
Jack Frank
|
|
|
Rick ###-####please call first p/s o/h rec. ok and r/i for basement and upstairs bath ok only 3/2/2001 2:43:11 PM
|