Final | 4/24/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 07:28:07. Contact: ###-####.
|
Final | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### ###-####Sheath not into box flex into nm box 4/23/2001 3:13:35 PM
|
Rough-In Permanent Service | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Pat Lass
|
|
|
P/S U/G N Ok 3/9/2001 9:42:53 AM
|