Final | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | PASS |
Joe Ray
|
|
|
###-#### larry
|
Final | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | FAIL |
Joe Ray
|
|
|
###-#### LARRY access to j-box behind fix. 410-14b/i.d. of 6 and smaller/shall remove all tile in ceiling for insp. 10/18/2001 3:02:15 PM
|
Electrical Rough-In | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | PASS |
Joe Ray
|
|
|
###-#### larry post inspection light bases for parking lot 8/22/2001 1:45:28 PM
|
Electrical Rough-In | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PASS |
Joe Ray
|
|
|
ok to cover ###-####- larry parking lotlights ok 8/20/2001 2:20:40 PM
|
Permanent Service | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 13:08:27. Contact: ###-####. p/s ug n ok 8/7/2001 8:39:43 AM
|
Electrical Rough-In | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | PASS |
Joe Ray
|
|
|
OK TO COVER ON 3RD FLOOR- ###-####- HICKEY
|
Electrical Rough-In | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PASS |
Joe Ray
|
|
|
underground for the telephone conduit Larry ###-####
|
Electrical Rough-In | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Jim Schmer
|
|
|
r/i ###-####-- larry -2nd floor -walls only
|
Electrical Rough-In | 6/14/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Joe Ray
|
|
|
cover on the ground floor ###-#### 1st floor cover ok 6/14/2001 1:46:34 PM
|
Electrical Rough-In | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PART |
Joe Ray
|
|
|
Partial r/i Please call Larry ###-#### in the foyer in the main entrance front entry r/i only 5/9/2001 1:00:26 PM
|
Electrical Rough-In | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | PART |
Jack Frank
|
|
|
underground Larry ###-#### ok 4/23/2001 10:35:35 AM
|
Electrical Rough-In | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PASS |
Joe Ray
|
|
|
underground Larry ###-####
|