Permanent Service | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 15:42:48. Contact: ###-####. P/S U/G N Ok 3/28/2001 9:08:05 AM
|
Final | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 17:08:21. Contact: ###-####. G.E.C. not to neutral 3/15/2001 9:56:04 AM
|
Final | 3/15/2001 | 3/15/2001 | 3/15/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by Inspector: 336 On 3/15/2001 9:56:36 AM #8 main bonding jumper appears to be too small called contractor 3/15/2001 10:32:36 AM
|