Final | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Jack Frank
|
|
|
Mike ###-#### ok 7/13/2001 2:11:01 PM
|
Electrical Rough-In | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 08:15:52. Contact: ###-####. Partial U/G Ok 6/1/2001 12:20:57 PM
|
Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 5/24/2001 1:11:03 PM r/i in attic space ok
|
Permanent Service | 5/24/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 05:56:49. Contact: ###-####. p/s u/g new ok 5/24/2001 1:10:24 PM
|
Permanent Service | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | FAIL |
Jack Frank
|
|
|
Mike ###-#### called talked with contractor bond water system, install GEC in their own conduits and uncover u/g that was covered before inspection 5/23/2001 4:56:22 PM
|
Electrical Rough-In | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 13:35:03. Contact: ###-####. u/g ok 4/2/2001 8:53:46 AM
|