Final | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PASS |
Jack Frank
|
|
|
###-#### ok 7/18/2001 12:57:39 PM
|
Final | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:54:08. Contact: ###-####. cor. posted talked wiyh owner needs gfci protection label panel remove bond strap, remove equip grd from neutral bus 7/16/2001 3:17:59 PM
|
Electrical Rough-In | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | PART |
Jack Frank
|
|
|
###-#### ground ok for cover 6/6/2001 9:08:47 AM
|
Electrical Rough-In | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Jack Frank
|
|
|
###-#### conference ok 6/4/2001 2:49:56 PM
|