Final | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Pat Lass
|
|
|
Jesse ###-####
|
Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 07:20:16. Contact: ###-####. T/O Ok no office furn 4/17/2001 10:04:52 AM
|
Rough-In Permanent Service | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 09:10:34. Contact: ###-####. P/S U/G add on ok 4/6/2001 3:58:16 PM
|
Electrical Rough-In | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 16:54:57. Contact: ###-####.
|
Electrical Rough-In | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 09:20:20. Contact: ###-####. NR - do not install ceiling tiles.
4/3/2001 12:56:22 PM
|
Electrical Rough-In | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | FAIL |
Pat Lass
|
|
|
emerald tech center farthest bld back next to fiber pipe east end ###-#### wrong address 3/23/2001 3:11:14 PM
|
Electrical Rough-In | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Pat Lass
|
|
|
emerald tech center farthest bld back next to fiber pipe east end ###-#### walls ok 3/23/2001 3:11:46 PM
|