Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 09:09:08. Contact: ###-####. ok 4/17/2001 2:48:22 PM
|
Electrical Rough-In | 3/28/2001 | 3/29/2001 | 3/29/2001 | A | PASS |
Jack Frank
|
|
|
after 8:00\\###-#### ok 3/29/2001 12:48:17 PM
|
Electrical Rough-In | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 15:11:07. Contact: ###-####.
|