Final | 4/25/2001 | 4/26/2001 | 4/26/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/25/2001 at 17:06:30. Contact: ###-####. ok 4/26/2001 10:30:12 AM
|
Electrical Rough-In | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 17:02:55. Contact: ###-####. needs to seal ko s and support MC 4/11/2001 9:22:23 AM
|
Electrical Rough-In | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Jack Frank
|
|
|
Jean ###-#### ceiling ok 4/11/2001 3:21:50 PM
|