Final | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Joe Ray
|
|
|
fn-- jim ###-#### fn
|
Permanent Service | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 16:05:16. Contact: ###-####. p/s u/g rec ok JF correction posted, and $42.00 reinspection fee due. 300-10 fittings top of gear 348-13 tighten strut straps 5/9/2001 9:43:30 AM
|
Permanent Service | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 11:13:38. Contact: ###-####. confe 5/7/2001 11:20:19 AM ence 5/7/2001 11:20:27 AM
|
Permanent Service | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 15:30:38. Contact: ###-####. cor. posted called see jf for details 5/1/2001 4:59:31 PM
|
Electrical Rough-In | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 14:12:55. Contact: ###-####. ceiling inspection only ceiling ok for cover 4/24/2001 9:46:14 AM
|
Electrical Rough-In | 3/30/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 13:40:34. Contact: ###-####. support mc cable 4/2/2001 3:20:20 PM
|