Final | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 13:03:42. Contact: ###-####.
|
Final | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 14:24:37. Contact: ###-####.cor. and fee due posted talked with contractor on job site see correction posted at panel or see JF
5/21/2001 1:13:46 PM
|
Rough-In Permanent Service | 4/5/2001 | 4/9/2001 | 4/9/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 10:08:58. Contact: ###-####. p/s ug n ok 4/9/2001 12:05:03 PM
|