Final | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Pat Lass
|
|
|
FN - RE-INSP DL ###-####
|
Final | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### Bath GFCI and bond water 8/7/2001 1:24:52 PM
|
Electrical Rough-In | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PASS |
Joe Ray
|
|
|
CEILING COVER\\###-####
|
Electrical Rough-In | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### no one at job new what needed inspection called contractor left message no response back 7/18/2001 11:45:52 AM
|
Electrical Rough-In | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Mike Kinnear
|
|
|
reception desk front entrance Dennis ###-#### ok cover reception area walls only 6/11/2001 2:17:38 PM
|
Electrical Rough-In | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Pat Lass
|
|
|
wall cover dennis ###-#### Phase 2 ok 5/11/2001 3:41:28 PM
|
Electrical Rough-In | 4/12/2001 | 4/12/2001 | 4/12/2001 | P | PART |
Pat Lass
|
|
|
late\\###-####Wall R/I Ok 4/12/2001 4:45:04 PM
|