Final | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 08:21:50. Contact: ###-####. ok final 7/10/2001 9:37:13 AM
|
Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 07:40:19. Contact: ###-####. conf with contractor bonding & panal labling 6/19/2001 4:27:48 PM
|
Electrical Rough-In | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Mike Kinnear
|
|
|
UNDERGROUND AND A POTTING INSPECTION KATHY ###-#### ok cover under ground conduit & ok potting 5/15/2001 3:36:03 PM
|
Electrical Rough-In | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | NR |
Jack Frank
|
|
|
underground and potting late morning if possible Kelly ###-#### u/g needs to be 18 inches deep 5/11/2001 10:38:37 AM
|
Electrical Rough-In | 4/16/2001 | 4/17/2001 | 4/17/2001 | A | PASS |
Mike Kinnear
|
|
|
bonding for a pool Kathy ###-#### ok pool bond 4/17/2001 8:35:13 AM
|