Final | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PASS |
Marv Burrus
|
|
|
SARA ###-####. corrections completed. 11/19/2001 1:47:37 PM
|
Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### SARA corrrection posted called needs to install fixture trims closet shelves and install gfciand correct gfci line and load for j tub 11/16/2001 10:56:13 AM
|
ELE-Aging Inspection | 11/8/2001 | 11/8/2001 | 11/8/2001 | | PART |
Jack Frank
|
|
|
W S U C contractor will call when ready 11/8/2001 2:24:56 PM
|
Electrical Rough-In | 8/8/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 21:03:12. Contact: ###-####. p/s o/h reconnect ok - ok cover ri 8/10/2001 9:25:28 AM
|
Electrical Rough-In | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 21:28:09. Contact: ###-####. cor. posted box fill 3 locations upstairs and needs #4 to bond nipple 8/8/2001 10:59:02 AM
|
Rough-In Permanent Service | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. posted 370-16, 300-14, 300-4, 210-11(c)(3), 210-52(a) needs 200 amp meterbase u bolt or guy kit and proper clearence from drip loop to roof 7/31/2001 3:59:32 PM
|
Electrical Rough-In | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:12:09. Contact: ###-####. owner will call and request a conference 7/16/2001 2:08:15 PM
|