Final | 6/3/2001 | 6/4/2001 | 6/4/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/03/2001 at 19:13:25. Contact: ###-####.ok 6/4/2001 10:54:18 AM
|
Permanent Service | 5/8/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 18:50:57. Contact: ###-####. p/s o/h rec. ok 5/9/2001 2:17:50 PM
|
Electrical Rough-In | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 13:08:39. Contact: ###-####. ok 4/27/2001 9:44:00 AM
|
Electrical Rough-In | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | FAIL |
Jack Frank
|
|
|
wall cover\\###-#### cor. posted called 300-4 for mc cable 4/26/2001 1:45:46 PM
|