Final | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Jack Frank
|
|
|
###-#### DENNIS no card at job site to sign 12/12/2001 11:09:35 AM
|
Final | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Pat Lass
|
|
|
fn jerry ###-#### signed ///////////T/O 11/20/2001 11:06:37 AM
|
Final | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 10:45:33. Contact: ###-####.
|
Electrical Rough-In | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 13:51:46. Contact: ###-####. Most of the ceiling ok exit lights and lights by rollup doors 10/10/2001 10:42:37 AM
|
Electrical Rough-In | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 11:57:31. Contact: ###-####. r/i walls ok 8/17/2001 11:06:37 AM
|
ELE-Aging Inspection | 7/26/2001 | 7/26/2001 | 7/26/2001 | | NR |
Pat Lass
|
|
|
SUC 8/1/2001 10:52:26 AM
|