Final | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 15:23:26. Contact: ###-####.
|
Final | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Joe Ray
|
|
|
fn -steve ###-#### -re-insp
|
Electrical Rough-In | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PASS |
Joe Ray
|
|
|
conference Steve ###-####
|