Final | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 14:04:26. Contact: ###-####.
|
Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 08:15:27. Contact: ###-####. Lea ok for r/i DCI tv cable needs riser rated cable 6/5/2001 2:37:14 PM
|
Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 6/5/2001 3:50:59 PM ceiling cover ok notes on first response are a mistake
|
Electrical Rough-In | 5/8/2001 | 5/9/2001 | 5/9/2001 | P | PART |
Jack Frank
|
|
|
r/i ###-####- tony walls and hard ceiling ok no grid 5/9/2001 4:30:18 PM
|