Final | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 13:56:05. Contact: ###-####.
|
Final | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | FAIL |
Joe Ray
|
|
|
###-#### recpt in bath tub space/called contr 7/24/2001 2:12:49 PM 7/24/2001 2:14:26 PM
|
Electrical Rough-In | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Pat Lass
|
|
|
Added by Inspector: 336 On 5/7/2001 12:04:23 PM
|
Rough-In Permanent Service | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Pat Lass
|
|
|
Allen ###-#### P/S U/G N Ok Nail plates required for R/I
5/7/2001 12:04:09 PM
|