Final | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 08:19:16. Contact: ###-####. completed 6/21/2001 2:05:04 PM
|
Rough-In Permanent Service | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 10:22:00. Contact: ###-####. p/s u/g new ok r/i ok 5/23/2001 2:04:19 PM
|
Electrical Rough-In | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | CANC |
Jack Frank
|
|
|
Scheduled by Inspector: 315 On 5/11/2001 3:57:58 PM 5/11/2001 4:01:38 PM
|
Rough-In Permanent Service | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 09:00:50. Contact: ###-####. corrections I talked about with electrician with 05-07-01 still not completed 5/8/2001 2:10:34 PM
|
Rough-In Permanent Service | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### 300-4 protection 210-52 (a) &(c) outlet spacing talked to electrician at job site 5/7/2001 2:19:24 PM
|