Final | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 18:54:40. Contact: ###-####.
|
Final | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 18:24:07. Contact: ###-####. temp/occp 6/20/2001 9:16:39 AM
|
Final | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 13:08:29. Contact: ###-####. bond hot and cold/support flex 6/19/2001 9:41:18 AM
|
Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 09:24:57. Contact: ###-####.
|
Electrical Rough-In | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PASS |
Jim Schmer
|
|
|
ceiling ###-####
|
Electrical Rough-In | 5/14/2001 | 5/15/2001 | 5/15/2001 | A | PASS |
Joe Ray
|
|
|
###-#### r/i walls 5/15/2001 12:50:50 PM
|
Electrical Rough-In | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Joe Ray
|
|
|
underground suite 200-tonya ###-####
|