Final | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | DONE |
Jack Frank
|
|
|
###-#### was this realy finaled? customer doesn't think so yes this finaled 10/17/2001 12:55:34 PM
|
ELE-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PART |
Jack Frank
|
|
|
talked with John of Romar, job is S U C 9/26/2001 1:58:23 PM
|
Final | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 09:01:54. Contact: ###-####. temp/occup for 90 days 6/26/2001 1:51:04 PM
|
Final | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 08:47:03. Contact: ###-####. temporary occupancy; only for tenant to move-in. not for general public occupancy. 6/22/2001 4:15:15 PM
|
Electrical Rough-In | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 11:47:00. Contact: .
Partial ceiling ok 6/19/2001 12:08:19 PM
|
Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 09:41:24. Contact: . 5/24/2001 3:47:04 PM conference with owner and Romar, service gear 5/24/2001 3:51:03 PM
|
Electrical Rough-In | 5/22/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 06:39:33. Contact: ###-####. conference with Romar correction posted noting problems with existing service
see J Frank for details 5/22/2001 4:44:07 PM
|
Electrical Rough-In | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 10:41:17. Contact: . walls and u/g 5/17/2001 4:52:55 PM
|