Final | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PASS |
Joe Ray
|
|
|
###-####
|
ELE-Aging Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | | NR |
Joe Ray
|
|
|
suc 11/6/2001 4:21:54 PM
|
Electrical Rough-In | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:29:32. Contact: ###-####. ok corrections made 8/2/2001 4:21:29 PM
|
Electrical Rough-In | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Joe Ray
|
|
|
1st thing in the am or before noon Earl ###-#### conference 7/20/2001 10:11:13 AM
|
Electrical Rough-In | 6/12/2001 | 6/13/2001 | 6/13/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 17:53:01. Contact: ###-####. conference only 6/13/2001 12:13:58 PM
|