Final | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 14:02:23. Contact: ###-####. completed. 8/14/2001 9:49:38 AM
|
Electrical Rough-In | 7/2/2001 | 7/3/2001 | 7/3/2001 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 13:57:42. Contact: ###-####.
|
Permanent Service | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 16:29:59. Contact: ###-####. check for berm on final; perm/svc
p/s oh n tri-state ele #1606 ok. 6/8/2001 8:56:08 AM
|
Electrical Rough-In | 6/7/2001 | 6/8/2001 | 6/7/2001 | A | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 16:23:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/07/2001 at 16:28:47.
|
Electrical Rough-In | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 14:34:23. Contact: ###-####. table 300-5. p.v.c. conduit shall be no less than 18 inches depth in trench. 5/31/2001 10:39:20 AM
|
Electrical Rough-In | 5/22/2001 | 5/23/2001 | 5/23/2001 | P | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 15:19:05. Contact: ###-####. main service not completed. filled trench in before underground. inspection; will reopen designated sections for inspection. 5/23/2001 3:10:51 PM
|