Final | 1/30/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Joe Ray
|
|
|
at 9:30 per joe--dave -###-#### fn
|
ELE-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | NR |
Joe Ray
|
|
|
called contr /contr will reschedual 1/31/2002 8:35:07 AM
|
ELE-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | NR |
Joe Ray
|
|
|
|
Final | 9/19/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Jim Schmer
|
|
|
late am ###-#### changed to Monday am per Jim S. conduit on island exposed to damage & sign not app. 9/25/2001 11:19:09 AM
|
Electrical Rough-In | 6/29/2001 | 7/2/2001 | 7/2/2001 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 06/29/2001 at 12:58:19. Contact: .
|